<aside>

My role: Service Designer

Client: Home Office (Public Sector)

Year: September 2024 - March 2025

Methods and tools: Process maps, Workshops, Mural

</aside>

<aside> <img src="/icons/info-alternate_blue.svg" alt="/icons/info-alternate_blue.svg" width="40px" />

I moved off the project before the pilot ran. This case study covers the design work up to that point.

</aside>


Summary

Overview

The Home Office wanted to reduce long waiting times in asylum decision-making.

The client had already chosen two interventions to test:

  1. A questionnaire for people applying from within the UK (pilot): sent to people after screening. They answer in writing, and the answers help prepare a targeted interview.
  2. Extended screening at Manston for new arrivals (proof of concept): more questions upfront, so decision makers can focus interviews on protection needs and decide faster.

What they lacked was a clear picture of how the interventions would fit alongside existing processes, teams and systems or how to test them before committing to large-scale change.

<aside> <img src="/icons/briefcase_green.svg" alt="/icons/briefcase_green.svg" width="40px" />

Role: Service Designer, working with business analysts, a user researcher and other consultants.

</aside>

Goal

Work out how both interventions could run inside the current operating model, meaning the processes, teams and data already in place, so they could be tested.

Do all of this with no discovery phase, no technology changes and limited time.

Outcomes